**The Role**:
**What’s the role?**
You will manage SJI (Shell Jurong Island) maintenance proactive and reactive jobs and coordinate integrated schedule with Production and stakeholders to produce a resource-optimized maintenance execution baseline plan.
The Scheduler is responsible for integrated scheduling maintenance activities in SJI production units including construction and non-routine maintenance.
Principal Accountabilities
- Compliance to HSSE standards and requirements to make SJI a safe place to work, and accountable for all assigned Critical activities
- Perform Authorized Applicant/Authorized Engineer as per SJI Permit to Work (PTW) requirement.
- Drive high standard of personal accountability & performance to deliver the Site & Department goals and target.
- Active participation in ISO & all maintenance related internal and external audits/surveys.
- Accountable to perform assigned Critical activities per Process Safety requirements (Hazard Effect Management Process (HEMP), Instrument Protective Function (IPF)/ Instrument Safe Guarding System, etc) are executed as planned.
- Controller of all SJI in-house contractor resources.
- Ensure optimum contractor resource utilization.
- Accountable to deliver/publish optimal daily and weekly work schedules to the relevant stakeholders.
- Chair daily maintenance activities schedule meeting to provide progress update & look ahead resource planning/scheduling.
- Ensure preventive maintenance work schedules are developed for equipment and clusters of equipment in a contiguous manner.
- Ensure timely update of work schedule based on the occurrence of reactive work orders, emergency work, schedule breakers, unplanned shutdown, and pit-stops.
- Determine actual level of resources available with respect to projected level of resources available and its impact on work schedule. Develop work schedule based on work order backlog that is optimized to the existing resources available.
- Track and update schedule changes due to interruptions of emergency & schedule breaker work orders.
- Track & monitor both proactive and reactive work orders are timely scheduled before the due date.
- Ensure the integrated schedule is reviewed regularly based on actual field execution and inform planners to revise/update the equipment task list accordingly.
- Monitor the level of work order backlog for scheduling in relation to the availability of resources and recommend improvement plans.
- Link individual Activities to Resource id in the schedule for tracking, monitoring and optimize contractor resources.
- Forecast integrated resources requirements based on 90days look ahead meeting.
- Tracking of related Maintenance Department KPIs and recommend necessary actions to improve them.
- Contribute and participate actively in site cost improvements.
- Improve effectiveness of maintenance scheduling e.g., bundling of Preventive Maintenance (PM) and Corrective Maintenance (CM) to lean out the schedule and optimize the resources.
- Work with Production to ensure AMS work processes are executed as designed and are delivering results, e.g., ensure compliance with ME - Integrate Maintenance Schedule RP and other Shell Group business objectives.
- Share Scheduling best practices across SJI operating units. Protect Hard and soft week schedule.
- Coordinate with Operation Maintenance Coordinator (OMC), Production teams, Plant Engineers, Contractors, workshop, and other supporting functions to ensure the routine maintenance / non-routine maintenance work schedule is optimal, realistic, and executable.
- Critical Activities - Ensure planned inspection/ PMs are carried out according to schedule defined in GSAP to provide that it maintains the original functionality e.g., electrical equipment.
- Critical Activities - Follow all Maintenance department critical procedures. Plan & Schedule the PM for HEMP Critical Equipment according to documented GSAP interval. Plan & Schedule repair in response to GSAP notification in order of priority defined by GAME ME Prioritization Tool.
- Critical Activities - Ensure safety & emergency equipment is always maintained via adequate PM as per schedule and plan and available for use.
- Identify waste elimination and LEAN maintenance opportunities for maintenance, and work with relevant key stakeholders to implement gap closure plans.
- Use Computerized Maintenance Management System (CMMS) in compliance with the global maintenance and business processes.
- Perform standby duty coverage for own engineering discipline. Carrying out any other related duties as required.
Decision-Making
- Resolve conflicting resource requirements to ensure the development of an optimized work schedule.
- Evaluate and determine the optimal level of resources required on site.
- Rearrange the schedule of maintenance activities due to Emergency and Schedule Breaker (E & SB) priority emergence work or bundling the schedule for equipment within the same process unit/system.
- Re-arrang
-
Scheduler
1 week ago
Singapore SWIFT INTEGRATED LOGISTICS (S) PTE. LTD. Full timeMonitor customers' daily operational needs - Close monitoring of daily schedule & diversion - Mileage reporting - Manage delivery trip report for Finance department - Daily schedule and data entry for operations - Replacement truck and diversion report - Ensure truck’s availability meet customer’s requirement - Handle driver’s on-off days, work and...
-
Scheduler
7 days ago
Singapore R.J. CROCKER CONSULTANTS PTE. LTD. Full time**Roles & Responsibilities**: - Develop and maintain the project schedule to manage timelines and commitments effectively. - Review, Track & Monitor main contractors' programmes and/or client's direct contractors' programmes to comply with client requirements - Review the contractors’ baseline S-curve, cost loading, resource allocation, histograms and 4D...
-
Scheduler
2 weeks ago
Singapore NBCUniversal Full time71864BR - Production - CNBC **Responsibilities** **OVERVIEW** The Scheduler is an essential team member of the technical operations function who will create transmission schedules for all CNBC International channels. He/she will also work closely with the CNBC International Transmission team, as well as NBCU News Group’s teams to schedule and plan on-air...
-
Scheduler
2 weeks ago
Singapore NBCUniversal Full time**OVERVIEW** The Scheduler is an essential team member of the technical operations function who will create transmission schedules for all CNBC International channels. He/she will also work closely with the CNBC International Transmission team, as well as NBCU News Group’s teams to schedule and plan on-air and promo content for our international news...
-
Scheduler
2 weeks ago
Singapore WATT WAH PETROLEUM HAULAGE PTE LTD Full timeMonitor customers' daily operational needs - Close monitoring of daily schedule & diversion - Mileage reporting - Manage delivery trip report for Finance department - Daily schedule and data entry for operations - Replacement truck and diversion report - Ensure truck’s availability meet customer’s requirement - Handle driver’s on-off days, work and...
-
Scheduler
1 week ago
Singapore WOH HUP (PRIVATE) LIMITED Full timeHandle and determine quantities, shapes, sizes and location of rods from drawings and sketches. - Plans and prepares rebar schedule (per area)/cutting list schedule according to design specification. - Prepare quantity of steel material needed for design execution. - Control and minimize material wastages. - Compile and prepare material wastage summary;...
-
Scheduler
2 weeks ago
Singapore WOH HUP (PRIVATE) LIMITED Full timeHandle and determine quantities, shapes, sizes and location of rods from drawings and sketches. - Plans and prepares rebar schedule (per area)/cutting list schedule according to design specification. - Prepare quantity of steel material needed for design execution. - Control and minimize material wastages. - Compile and prepare material wastage summary;...
-
Scheduler
1 week ago
Singapore WOH HUP ENGINEERING PTE. LTD. Full time**A summary of the responsibilities of this position are, and not limited to, as follows**: - Handle and determine quantities, shapes, sizes and location of rods from drawings and sketches. - Plans and prepares rebar schedule (per area)/cutting list schedule according to design specification. - Prepare quantity of steel material needed for design...
-
Scheduler
4 hours ago
Singapore Promatan Pte Ltd Full time $60,000 - $80,000 per yearRequirements:Minimum Diploma in any Engineering Discipline.Preferably with some years in Engineering, Projects, Maintenance, Turnaround, or Operation experience.Minimum 2 years hands-on experience in scheduling using Primavera P6
-
Senior Scheduler
1 week ago
Singapore KPF (SINGAPORE) PTE. LTD. Full timeResponsibilities include the following: - You will have 15+ years of experience in scheduling of infrastructure design and construction work At least 10 years relevant experience in planning and scheduling coordination for projects such as mixed-use development or multi-modal transport hub of minimum construction value of S$600 million and above. -...